Every CDC renovation follows a structured 7-step process designed to keep things clear, calm, and on track. From the first conversation to handover, you will always know what is happening and what comes next.

Step by Step

Our 7-Step Renovation Process

01

Understand your home and your day

We start with an on-site visit to your Gold Coast home. Mark measures the space, looks at the existing plumbing, electrical, and structure, and sits down with you to understand how you actually use the rooms. We ask what works today, what doesn't, and what you want this renovation to change about how you live. No sales pitch — just a conversation about your home.

02

Planning with you

We turn what you told us into a written scope. Must-haves, nice-to-haves, and the things we'd recommend against. You get a one-page priority list before any design work starts, so the direction is agreed before money or time goes into details. This is where we usually also flag whether your project will need a council DA, a building approval, or body corporate sign-off.

03

Design and selections

Our designer walks you through layout options, cabinetry, benchtops, tapware, tiles, lighting, and appliances. You see 3D renders before anything is ordered. We curate the selections so you're choosing between three strong options, not drowning in a showroom. Every selection is costed in real time, so you never fall in love with a finish that breaks the budget.

04

Fixed-price quote and timeline

You receive a written, itemised, QBCC-compliant contract with a fixed price and a realistic timeline. Deposits stay within QBCC limits (5% for contracts over $20,000). Progress payments are tied to real milestones you can verify. You know the total cost, the start date, the handover date, and exactly what's included before you sign anything.

05

Confirm decisions before we start

Before demolition begins, every selection is locked in and every long-lead item is ordered. Stone, tapware, tiles, and appliances all arrive on site before the trades that need them. Locking decisions early is the single biggest reason our builds finish on time, because 90% of cost and schedule overruns come from mid-build indecision.

06

Build and communication

Work starts on the agreed date. You get a weekly update from Mark by text or email — what happened this week, what's next, what needs a decision from you. Trades are sequenced tightly so the site moves every day. Waterproofing is flood-tested on bathrooms. Electrical and plumbing are signed off by licensed trades with their own compliance certificates.

07

Handover and settling in

At handover we walk you through every drawer, tap, and switch. You get the QBCC compliance paperwork, every trade certificate, appliance manuals, and the 10-year waterproofing warranty on wet areas. 30 days later we check in, and 12 months later we check in again, because a good renovation should feel just as right in year one as it did on day one.

The CDC Difference

What Makes It Different

Fixed-Price Contracts

No surprises. Your quote is your price. We lock in costs upfront so you can plan with confidence.

Single Point of Contact

One person manages your project from start to finish — no being passed around between teams.

Design-Led Approach

Every renovation starts with design. We help you visualise your space before construction begins.

Clear Timeline

Realistic timeframes communicated upfront. You always know what is happening and what comes next.

Start Your Renovation

Ready to transform your home? Book a free consultation and we will walk you through our process.